Traverse City, MI • 3 weeks
Hillside Terrace Reset
A steep-slope property needed drainage, structure, and cleaner visual lines before peak season.
Read Case StudyCase Studies
A CMS-ready collection of project stories with challenge, approach, and measurable outcomes.
Traverse City, MI • 3 weeks
A steep-slope property needed drainage, structure, and cleaner visual lines before peak season.
Read Case StudyGarfield Township, MI • 14 weeks
A recurring lawn and bed-detail program transformed a high-visibility corner lot over one season.
Read Case StudyAcme Township, MI • 5 days
An older multi-zone sprinkler setup was repaired and rebalanced to stop dry patches and overwatering.
Read Case Study